保亭悔钨食品有限公司

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
飞鲸体育直播ufc| 十大最好用的看球软件| nba直播(jrs无插件)极速体育| 龙珠无插件直播足球| bet356体育在线亚洲版网页版| 咪咕cctv5现场直播| 88体育app直播最新版| 球宴体育网址| 羽毛球直播免费观看| 下载咪咕体育直播视频| 下载咪咕体育直播视频| 看球体育直播app官网| 足球直播免费视频直播软件| 蓝鲸体育app官方下载| 鲸鱼体育app下载安卓版本安装| 飞鲸体育直播| 免费直播看球赛的app| 免费足球直播app哪个软件好| 推荐一些免费观看足球比赛直播的APP| 蓝鲸体育app官方下载| 山猫体育免费直播| 看球软件免费下载| 雨燕体育直播| 人人体育app官方版| 178体育赛事免费直播| 东方赢家app下载| 365体育平台介绍| 咪咕咪咕体育| 人人体育app官方下载| 8868体育平台| 足球直播软件哪个好| jrs直播低调看直播奥运会| jrs低调看高清直播免费| 178体育苹果下载| 咪咕咪咕体育| 看个球app官方免费下载| 竞彩足球app官方版下载地址| 龙珠足球直播(无插件)直播体育| 咪咕cctv5现场直播| 88看球直播高清| jrs低调看NBA高清直播官网|