Process requirements for injection molding

Release time:2024-07-10

Injection molding is a specific cycle. There are five factors that affect injection molding: temperature, speed, pressure, position and time. These five process factors determine the quality of injection molding. The quality problems often encountered in injection molding are mostly caused by five uncontrolled quality abnormalities.


Temperature is the primary factor of injection molding, which can be divided into several key factors, such as drying temperature, material temperature and mold temperature. The drying temperature is the pre drying of plastic materials to ensure that the molding quality and the drying and wetting degree of plastic are within a certain range; Temperature is the normal plasticization and smooth filling and molding of plastics; Mold temperature is an important factor in the process of injection molding. The temperature, appearance and molding cycle of injection mold affect the cooling rate and appearance quality of products in the mold cavity.


The second factor is speed: speed is divided into injection mold speed, molten material temperature, demoulding speed, mold opening and closing speed, and mold advance and retreat speed before thimble. The increase of injection speed affects the increase of mold pressure. Improving the injection molding speed can improve the flow rate, make the product quality uniform, and ensure the product quality. High speed injection is suitable for long process products. The injection speed of controlling the product size at low speed affects the plasticizing ability. Plasticizing ability is an important parameter of plasticizing quality. The higher the speed is, the higher the melt temperature is, and the loosening speed with stronger plasticizing ability is to reduce the melt specific volume, The opening and closing speed of reducing the internal pressure of the melt and preventing its outflow is an important condition to ensure the mechanical operation.


The third factor is pressure: pressure is divided into injection pressure, holding pressure, back pressure, mold locking pressure, mold support protection pressure and ejection pressure. Injection pressure is used to ensure the pressure loss of melt from nozzle runner gate cavity to ensure that the cavity is full; The pressure maintaining method is used to reduce the cracking or bending of the plastic mold caused by excessive injection pressure. The pressed method is used to prevent the mold from cracking due to foreign matters under high speed and high pressure; The jacking method is used to prevent the product from detaching from the mold surface and damaging the mold.


The fourth factor is location: location can be divided into mold opening location, ejection modulus, measurement modulus, injection modulus and buffer modulus. The mold opening position is to ensure that the demoulding parts can work normally; The ejection stroke is the protective effect of the partial return of the spring on the ejection limit; The jacking stroke is to ensure that there are enough plastic filling molds to ensure product quality; The top return process is to increase the specific capacity of the melt in the metering cavity, reduce the internal pressure, and prevent the melt from flowing outward from the cavity; The jacking stroke is to prevent mechanical damage accidents caused by the contact between the screw head and the nozzle.


The fifth factor is time: time is divided into cooling time of plastic products, plastisol time, plastic drying time, cooling time of plastic products, melting time, drying time, circulation time and pressure holding time. The molding of products requires a specific cycle; Injection time determines the size of injection molded products; Pressure maintaining is to prevent melt backflow; Cooling shrinkage effect; The cooling time is to ensure the solidification of plastic products and prevent product deformation; The spraying time is to ensure sufficient products; Drying time is a factor to ensure that the product will not grow longer and the quality is poor.


圖片4-2.png

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
球宴app官方入口| jrs低调看高清直播NBA无插件| nba新浪网体育| 足球直播软件哪个好| 实况足球网易版官网最新版本| 人人体育安卓版下载| 咪咕app下载官方下载| 今天最稳的足球推荐| 蓝鲸体育app下载安卓版本安装| 网络体育直播间| 01体育赛事免费直播| 鲸鱼体育官方版下载| 178足球免费直播手机版下载| 咪咕视频体育直播(无插件)| 下载竞彩足球彩票app| 可以看球赛的app| jrs直播低调看直播奥运会| 今天最稳的足球推荐| 178看球直播app下载| jrs直播低调看直播奥运会| 足球看盘软件哪个好| 体育赛事直播软件| 看个球app官方免费下载| 实况足球国际服下载2024| 88体育app直播最新版| 88体育官网手机版入| 8868体育APP下载网址| nba直播(jrs无插件)极速体育| 蓝鲸体育直播app官网下载| 免费NBA体育直播app| 黑白体育app版下载| 乐球直播免费体育直播回放视频| 咪咕视频体育直播(无插件)| 实况足球2024PC版| 乐球直播免费体育直播回放视频| 体育足球赛事| 实况足球2024PC版| 今晚足球比赛在哪可以看直播| 看球直播app下载| 足球直播软件哪个好| 在线观看免费足球直播的软件|